The background
Challenges
Our solution
- Upgraded 1st level (level 10) with BACnet and MS-4 room controllers.
- Upgraded remaining rooms (~150) over a 3 month period including the mainplant controllers.
- Retained the more recently upgraded Alerton ABS 3.0 front end, removed all BCM-TUX globals and re-engineered DDC for completed BACnet system.
- Implemented supply air monitoring and fault diagnosis for suspect mechanical valve operation or control.